Skip to content

How we work

Measure first, opine later

The order matters. A safety plan built on management perceptions treats the wrong symptoms and burns the year's budget.

Gas detector and log sheet resting on the handrail of a process plant
A detector and a log sheet: what gets measured in the field, before any report.

The process

Five steps, no shortcuts

  1. 01

    Framing

    We map the operation, its critical processes and what has been tried before. We define scope, sampling and the analysis cuts by area and shift.

  2. 02

    Measurement

    We apply the validated instrument with a guarantee of anonymity. Without it people answer what they think is expected of them and the data is worthless.

  3. 03

    Analysis

    We process results by dimension and by cut, identify the real hot spots and benchmark against national and international references.

  4. 04

    Debrief

    Two reports and a workshop: an executive one to decide, a technical one to execute, and a session with the management line so the result does not die inside a PDF.

  5. 05

    Follow-up

    We define indicators and measure again. Culture does not hold on its own: it slips back quietly when nobody is watching.

Questions we always get

It depends on the size of the operation and how many analysis cuts are needed. A safety climate measurement with debrief usually takes six to ten weeks from framing.

Barely. Applying the instrument is coordinated with the shifts and takes minutes per person. What does need diary time is the debrief workshop with the management line.

It is reported in aggregate. Nobody in the organisation receives identifiable individual answers, and that commitment is communicated to staff before the instrument is applied.

Yes, and that is exactly where it adds most. A certified system guarantees the procedures exist; culture measurement tells you whether people live by them and why sometimes they do not.

Want to know where you would be starting from?

The free self-assessment places you on the maturity curve in three minutes.